Posted on September 17, 2021 by Dinah Florence Talan Construction of Hand Washing Facilities in the DepEd-Bohol Division Office (2.70m x 0.70m) Masonry Works with Septic Tank 0.50m x 1.50m, w/ 12″x 12″x 15″ conc. Footing & Flooring